|
|
|
|
2024 International Building Code (IBC), Loose Leaf
The 2024 International Codes® (I-Codes®) have undergone substantial formatting changes as part of the digital transformation strategy of the International Code Council® (ICC®) to improve the user experience. The changes, promoting a cleaner, more modern look and enhancing readability and sustainability, include:
- Single
column text format and modernized font styles improves readability - QR Codes
replace vertical margin sidebars and arrows to identify code changes more accurately - Shading
for table headers and notes improves locating tables and applicable notes - Grouping
of associated content brings tables and figures immediately after the parent section - Users
have capability to validate authenticity of their book and register it with the ICC to receive incentives.
The 2024 IBC® applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2024 IBC® contains many important changes such as:
- Duties
and powers of the building official: an overall reformat of Section 104 regulating duties of the building official, the approach for reviewing for code compliance has been significantly updated to reflect the current manner that alternate materials, designs and methods are evaluated. - For
the first time ever, the 2024 IBC includes provisions for tornado loadings. - Updated
wind, earthquake, and snow loads. - The
updated design rain loads are now based on the summation of the static head, the hydraulic head, and the ponding head. - Updates
to Risk Categories including Photovoltaic (PV) panel systems and facilities providing power generation. - Updated
and expanded provisions for Temporary Structures. - New
provisions regarding the wind resistance of aggregate-surfaced roofs. - Roof
Coverings: Updated provisions for underlayment. - New
special inspection provisions for metal building systems. - New
provisions for structural concrete reinforced with glass-fiber reinforcement. - Concrete:
To improve ease of use, Chapter 19 on Concrete has been Updated and reformatted. - Masonry:
TMS 402 and TMS 602 references have been updated to the latest 2022 editions. - An
increase in the allowable height of a Group R-2 occupancy building with a NFPA 13R sprinkler system. - Occupiable
space requirements now apply if a roof is usable for anything more than maintenance or repair and occupants must have access to multiple egress options from a story based on the occupant load and the story requirements. - Adult
changing tables are now regulated where they are provided and are also required in large assembly and mercantile, college lecture hall/classroom buildings and highway rest stops. - Fire-resistance-rated
Wall Continuity: Updates on how supporting construction for exterior walls is to be fire-resistance-rated, especially in the case of a parapet. - Openings
in Shaft Enclosures: Additional exceptions are provided for shaft enclosures, including new allowances for openings and penetrations. - Carbon
Monoxide Detection: Carbon monoxide (CO) detection is now required in all occupancies where a CO-producing device is present. Detection and notification can be addressed in several ways. - Vapor
retarders: Several updates have been made to the vapor retarder provisions for consistency with the IRC and IECC. The changes also provide additional options and better guidance for allowable types and locations of permitted vapor retarders. - Vertical
and lateral Flame propagation compliance methods: Clarification has been provided as to when testing in accordance with NFPA 285, related to vertical and lateral flame propagation, is required. Previously this information was scattered in a variety of locations within Chapters 14 and 26. - New
Appendix P sets forth the scoping limitations and technical criteria for sleeping lofts that are provided within Group R dwelling units and sleeping units.
|
|
|
|
|
|
|